GPU WORLD · GW-LC-QD-SERVER
Server quick-disconnect kit
Mating interface reviewSpecify matched coolant couplings for server removal and service. Share the counterpart part number so the connector geometry, seals and operating limits can be reviewed.
Fit and compatibility
- Provide the insert and socket series, body size, end termination and seal material. Confirm whether the system uses hand-mated or blind-mate connections.
- Check the approved coolant and operating temperature and pressure. Review space for latching and release, or the chassis alignment and insertion force for blind-mate designs.
Scope of supply
- Quote the matched halves and identify the supply and return positions. Confirm whether adapters, brackets, caps or replacement seals are required.
- Request the supplier part drawings, pressure-drop curve, permitted connect and disconnect conditions and service cycle rating for the selected pair.
Operating conditions
- An OCP Universal Quick Disconnect reference helps define an interface. Confirm that both mating parts meet the required revision and size and have been qualified together for the intended fluid and operating conditions.
- Include coupling losses at design flow in the branch pressure budget. Agree on acceptable spill volume and air inclusion during servicing using supplier data and system requirements.
Acceptance checks
- Inspect the mating parts and verify locking, orientation and access in the installed position. Check for leakage in the coupled and uncoupled states under the approved test conditions.
- Record the results of the agreed connect and disconnect cycles. Verify leakage, spill volume and post-service pressure drop against the selected connector specification.
Technical references
Use these references to identify the platform and design requirements. GPU WORLD confirms the applicable assembly and operating conditions for each project.
CONFIGURATION & QUOTATIONSRequest a cooling quoteShare your server configuration and site conditions.Request a quote
Plan your cooling project
Our team will review server fit, heat rejection and the scope of supply.